🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Wind farms › California

WIND FARMS

Alta Mesa Project Phase IV

Alta Mesa Project Phase IV is a 40.0 MW cancelled wind farm in Riverside County, California, operated by Mark Technologies Corp.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore wind farms in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
GEN1Onshore Wind Turbine40 MW Cancelled or postponed

Plant details

Operator
Mark Technologies Corp
Location
Riverside County, California
Balancing authority
CISO
Sector
IPP Non-CHP
Capacity
Cancelled: 40.0 MW
EIA plant ID
55352

Location

33.9464, -116.6633

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem