United States › Power plants › Gas power plants › Kentucky
GAS POWER PLANTSHardinsburg Electric Generating Station
Hardinsburg Electric Generating Station is a 472 MW cancelled gas power plant in Breckinridge County, Kentucky, operated by AES Ohio Generation LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
| GT2 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
| GT3 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
| GT4 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
| GT5 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
| GT6 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
| GT7 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
| GT8 | Natural Gas Fired Combustion Turbine | 59 MW | Cancelled or postponed |
Plant details
- Operator
- AES Ohio Generation LLC
- Location
- Breckinridge County, Kentucky
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 472 MW
- EIA plant ID
- 55227
Location
37.7667, -86.5439
Nearby power plants
- New Frontiers SolarSolar farms · 100 MW · 2.8 mi
- Kentucky MillsBioenergy plants · 88.0 MW · 11.7 mi
- Cannelton Hydroelectric PlantHydroelectric plants · 87.9 MW · 12.8 mi
- Dyers Spring SolarSolar farms · 200 MW · 16.0 mi
- IMPA Tell City Solar ParkSolar farms · 1.1 MW · 16.3 mi
- Tell City Solar ParkSolar farms · 3.2 MW · 17.3 mi
- Green River SolarSolar farms · 200 MW · 18.4 mi
- Troy SolarSolar farms · 50.4 MW · 21.9 mi
- RockportCoal power plants · 2,600 MW · 29.1 mi
- D B WilsonCoal power plants · 509 MW · 36.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem