United States › Power plants › Wind farms › Colorado
WIND FARMSPonnequin Phase 1
Ponnequin Phase 1 is a 5.2 MW retired wind farm in Weld County, Colorado, operated by Ponnequin Acquisitions, LLC.
Plant statusClosed
- Planning (completed)
- Consented (completed)
- Construction (completed)
- OperatingMar 1998 (completed)
- ClosedDec 2013 (current stage)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| EXIS | Onshore Wind Turbine | 5.2 MW | Retired |
Plant details
- Operator
- Ponnequin Acquisitions, LLC
- Location
- Weld County, Colorado
- Balancing authority
- PSCO
- Sector
- IPP Non-CHP
- Capacity
- Retired: 5.2 MW
- First unit online
- Mar 1998
- EIA plant ID
- 55203
Location
40.9962, -104.8249
Nearby power plants
- South Cheyenne SolarSolar farms · 150 MW · 3.3 mi
- Roundhouse Renewable Energy IIWind farms · 106 MW · 9.8 mi
- Cheyenne Prairie Generating StationGas power plants · 260 MW · 10.4 mi
- Corriedale Wind EnergyWind farms · 52.5 MW · 11.6 mi
- Bison Solar LLCSolar farms · 30.0 MW · 13.3 mi
- Happy Jack Windpower ProjectWind farms · 29.4 MW · 13.4 mi
- Rawhide Prairie Solar HybridSolar farms, Battery storage · 23.0 MW · 13.8 mi
- RawhideCoal power plants, Gas power plants · 1,023 MW · 13.9 mi
- Silver Sage WindpowerWind farms · 42.0 MW · 13.9 mi
- Roundhouse Wind Energy ProjectWind farms · 226 MW · 16.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem