United States › Power plants › Oil-fired power plants › North Carolina
OIL-FIRED POWER PLANTSSmithfield Farmland Corp Bladen
Smithfield Farmland Corp Bladen is a 28.5 MW operating oil-fired power plant in Bladen County, North Carolina, operated by Smithfield Fresh Meats Corp..
Open in Google MapsMore oil-fired power plants in North Carolina
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN1 | Petroleum Liquids | 1.5 MW | |
| GEN2 | Petroleum Liquids | 1.5 MW | |
| GEN3 | Petroleum Liquids | 1.5 MW | |
| GEN4 | Petroleum Liquids | 1.5 MW | |
| GEN5 | Petroleum Liquids | 1.5 MW | |
| GEN6 | Petroleum Liquids | 1.5 MW | |
| GEN7 | Petroleum Liquids | 1.5 MW | |
| GEN8 | Petroleum Liquids | 1.5 MW | |
| GEN9 | Petroleum Liquids | 1.5 MW | |
| GN10 | Petroleum Liquids | 1.5 MW | |
| GN11 | Petroleum Liquids | 1.5 MW | |
| GN12 | Petroleum Liquids | 1.5 MW | |
| GN13 | Petroleum Liquids | 1.5 MW | |
| GN14 | Petroleum Liquids | 1.5 MW | |
| GN15 | Petroleum Liquids | 1.5 MW | |
| GN16 | Petroleum Liquids | 1.5 MW | |
| GN17 | Petroleum Liquids | 1.5 MW | |
| GN18 | Petroleum Liquids | 1.5 MW | |
| GN19 | Petroleum Liquids | 1.5 MW |
Plant details
- Operator
- Smithfield Fresh Meats Corp.
- Location
- Bladen County, North Carolina
- Balancing authority
- CPLE
- Sector
- Industrial Non-CHP
- Capacity
- Operating: 28.5 MW
- First unit online
- Oct 1993
- EIA plant ID
- 54823
Location
34.7463, -78.8073
Nearby power plants
- DD Fayetteville Solar NC LLCSolar farms · 23.1 MW · 6.4 mi
- Innovative Solar 42Solar farms · 71.0 MW · 8.1 mi
- Railroad Farm 2Solar farms · 5.0 MW · 9.2 mi
- St. Pauls Solar 2Solar farms · 5.0 MW · 10.0 mi
- St. Pauls Solar 1, LLCSolar farms · 4.9 MW · 10.2 mi
- Barker Solar, LLCSolar farms · 5.0 MW · 10.3 mi
- Railroad FarmSolar farms · 5.0 MW · 10.6 mi
- Robeson Solar ISolar farms, Battery storage · 108 MW · 11.6 mi
- CB Bladen Solar, LLCSolar farms · 5.2 MW · 11.7 mi
- ButlerBattery storage · 10.0 MW · 11.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem