United States › Power plants › Oil-fired power plants › North Carolina

OIL-FIRED POWER PLANTS

Smithfield Farmland Corp Bladen

Smithfield Farmland Corp Bladen is a 28.5 MW operating oil-fired power plant in Bladen County, North Carolina, operated by Smithfield Fresh Meats Corp..

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingOct 1993 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore oil-fired power plants in North Carolina

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
GEN1Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN2Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN3Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN4Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN5Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN6Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN7Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN8Petroleum Liquids1.5 MW Standby / back-upOct 1993
GEN9Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN10Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN11Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN12Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN13Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN14Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN15Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN16Petroleum Liquids1.5 MW Standby / back-upFeb 1995
GN17Petroleum Liquids1.5 MW Standby / back-upFeb 1998
GN18Petroleum Liquids1.5 MW Standby / back-upFeb 1995
GN19Petroleum Liquids1.5 MW Standby / back-upFeb 1998

Plant details

Operator
Smithfield Fresh Meats Corp.
Location
Bladen County, North Carolina
Balancing authority
CPLE
Sector
Industrial Non-CHP
Capacity
Operating: 28.5 MW
First unit online
Oct 1993
EIA plant ID
54823

Location

34.7463, -78.8073

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem