GAS POWER PLANTS · OIL-FIRED POWER PLANTSNew York University Central Plant
New York University Central Plant is a 19.0 MW operating power plant in New York County, New York, operated by New York University.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GT1 | Natural Gas Fired Combined Cycle | 5.5 MW | |
| GT2 | Natural Gas Fired Combined Cycle | 5.5 MW | |
| DE1 | Petroleum Liquids | 2.5 MW | |
| STG1 | Natural Gas Fired Combined Cycle | 2.9 MW | Planned, approvals not yet sought |
| GR1 | Natural Gas Internal Combustion Engine | 2.6 MW | Under construction (over 50%) |
| T1 | Natural Gas Fired Combined Cycle | 2.4 MW | Retired |
| D2 | Petroleum Liquids | 0.8 MW | Retired |
| D3 | Petroleum Liquids | 0.8 MW | Retired |
| D4 | Petroleum Liquids | 0.8 MW | Retired |
| D5 | Petroleum Liquids | 0.8 MW | Retired |
| D6 | Petroleum Liquids | 0.8 MW | Retired |
| D7 | Petroleum Liquids | 0.8 MW | Retired |
| DI | Petroleum Liquids | 0.8 MW | Retired |
Plant details
- Operator
- New York University
- Location
- New York County, New York
- Balancing authority
- NYIS
- Sector
- Commercial Non-CHP
- Capacity
- Operating: 13.5 MW
Planned: 2.9 MW
Under construction: 2.6 MW
Retired: 8.0 MW - First unit online
- Jan 1984
- EIA plant ID
- 54808
Location
40.7899, -73.9233
Nearby power plants
- Astoria Generating StationGas power plants · 943 MW · 0.6 mi
- Harlem River YardGas power plants · 94.0 MW · 0.8 mi
- ZeltmannGas power plants · 528 MW · 0.9 mi
- Hell GateGas power plants · 94.0 MW · 1.0 mi
- Astoria EnergyGas power plants · 595 MW · 1.5 mi
- Astoria Energy IIGas power plants · 650 MW · 1.5 mi
- The Mount Sinai HospitalOil-fired power plants · 17.6 MW · 1.6 mi
- Harlem Hospital CenterOil-fired power plants · 4.7 MW · 1.9 mi
- 74th StreetOil-fired power plants · 37.0 MW · 2.1 mi
- New York Presbyterian Hospital- 68th StreetGas power plants, Oil-fired power plants · 22.9 MW · 2.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem