🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Bioenergy plants › Florida

BIOENERGY PLANTS

Central District Wastewater Treat Plant

Central District Wastewater Treat Plant is a 4.8 MW operating bioenergy plant in Miami Dade County, Florida, operated by Miami Dade Water & Sewer Dept.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingOct 1989 (current stage)
  5. ClosedNov 2014 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore bioenergy plants in Florida

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
5Other Waste Biomass1.2 MW OperatingJun 2015
6Other Waste Biomass1.2 MW OperatingJun 2015
3AOther Waste Biomass1.2 MW OperatingMar 2013
4AOther Waste Biomass1.2 MW OperatingMar 2013
1Other Waste Biomass1.2 MW RetiredOct 1989Oct 2014
2Other Waste Biomass1.2 MW RetiredOct 1989Nov 2014
3Other Waste Biomass1.2 MW RetiredOct 1989May 2012
4Other Waste Biomass1.2 MW RetiredOct 1989May 2012

Plant details

Operator
Miami Dade Water & Sewer Dept
Location
Miami Dade County, Florida
Balancing authority
FPL
Sector
Commercial CHP
Capacity
Operating: 4.8 MW
Retired: 4.8 MW
First unit online
Oct 1989
EIA plant ID
54623

Location

25.7486, -80.1528

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem