🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Bioenergy plants › Florida

BIOENERGY PLANTS

Clewiston Sugar House

Clewiston Sugar House is a 49.0 MW operating bioenergy plant in Hendry County, Florida, operated by United States Sugar Corp.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 1945 (current stage)
  5. ClosedDec 2017 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore bioenergy plants in Florida

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
TG7Other Waste Biomass20 MW OperatingOct 2006
TG6Other Waste Biomass15 MW OperatingMar 2004
TG8Other Waste Biomass14 MW OperatingDec 2007
TG5Other Waste Biomass22 MW RetiredNov 1997Dec 2017
TG4Other Waste Biomass6.0 MW RetiredNov 1983Dec 2007
TG1Other Waste Biomass5.0 MW RetiredOct 1978Jan 2004
TG2Other Waste Biomass3.5 MW RetiredNov 1945Jan 2004
TG3Other Waste Biomass3.1 MW RetiredNov 1981Dec 2007
DGNPetroleum Liquids1.0 MW RetiredJun 1987May 2006
DGSPetroleum Liquids1.0 MW RetiredJun 1987May 2006

Plant details

Operator
United States Sugar Corp
Location
Hendry County, Florida
Balancing authority
FPC
Sector
Industrial CHP
Capacity
Operating: 49.0 MW
Retired: 41.2 MW
First unit online
Nov 1945
EIA plant ID
50482

Location

26.7351, -80.9377

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem