🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Hydroelectric plants › California

HYDROELECTRIC PLANTS

Edward C Hyatt

Edward C Hyatt is a 644 MW operating hydroelectric plant in Butte County, California, operated by California Dept. of Water Resources.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMar 1968 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore hydroelectric plants in California

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Conventional Hydroelectric117 MW OperatingMar 1968
3Conventional Hydroelectric117 MW OperatingJun 1968
5Conventional Hydroelectric117 MW OperatingAug 1968
2Hydroelectric Pumped Storage98 MW OperatingNov 1968
4Hydroelectric Pumped Storage98 MW OperatingDec 1968
6Hydroelectric Pumped Storage98 MW OperatingFeb 1969

Plant details

Operator
California Dept. of Water Resources
Location
Butte County, California
Balancing authority
CISO
Sector
Electric Utility
Capacity
Operating: 644 MW
First unit online
Mar 1968
EIA plant ID
437

Location

39.5430, -121.4922

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem