πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Geothermal plants β€Ί Utah

GEOTHERMAL PLANTS

Blundell

Blundell is a 38.1 MW operating geothermal plant in Beaver County, Utah, operated by PacifiCorp.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJul 1984 (current stage)
  5. Closed (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore geothermal plants in Utah

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Geothermal26 MW OperatingJul 1984
2Geothermal12 MW OperatingDec 2007
3Geothermal30 MW Cancelled or postponed

Plant details

Operator
PacifiCorp
Location
Beaver County, Utah
Balancing authority
PACE
Sector
Electric Utility
Capacity
Operating: 38.1 MW
Cancelled: 30.0 MW
First unit online
Jul 1984
EIA plant ID
299

Location

38.4889, -112.8533

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem