🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Gas power plants › Minnesota

GAS POWER PLANTS · OIL-FIRED POWER PLANTS · BATTERY STORAGE

Cambridge CT Hybrid

Cambridge CT Hybrid is a 195 MW operating power plant in Isanti County, Minnesota, operated by Great River Energy.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 1978 (current stage)
  5. Closed (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore gas power plants in Minnesota

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
GT2Natural Gas Fired Combustion Turbine169 MW OperatingMay 2007
GT1Petroleum Liquids25 MW OperatingMay 1978
BA1Batteries1.0 MW Under construction (up to 50%)Target Dec 2027

Plant details

Operator
Great River Energy
Location
Isanti County, Minnesota
Balancing authority
MISO
Sector
Electric Utility
Capacity
Operating: 194 MW
Under construction: 1.0 MW
First unit online
May 1978
EIA plant ID
2038

Location

45.6010, -93.2081

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem