🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Oil-fired power plants › Michigan

OIL-FIRED POWER PLANTS

Dafter

Dafter is a 11.0 MW operating oil-fired power plant in Chippewa County, Michigan, operated by Cloverland Electric Co-op.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 1955 (current stage)
  5. ClosedDec 2021 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore oil-fired power plants in Michigan

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
4Petroleum Liquids3.0 MW OperatingJun 1960
1CPetroleum Liquids2.0 MW OperatingDec 2021
2CPetroleum Liquids2.0 MW OperatingDec 2021
3CPetroleum Liquids2.0 MW OperatingDec 2021
4CPetroleum Liquids2.0 MW OperatingDec 2021
5Petroleum Liquids3.0 MW RetiredJun 1960Dec 2021
1Petroleum Liquids1.0 MW RetiredNov 1955Dec 2021
3Petroleum Liquids1.0 MW RetiredNov 1955Dec 2021

Plant details

Operator
Cloverland Electric Co-op
Location
Chippewa County, Michigan
Balancing authority
MISO
Sector
Electric Utility
Capacity
Operating: 11.0 MW
Retired: 5.0 MW
First unit online
Nov 1955
EIA plant ID
1868

Location

46.3744, -84.4172

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem