🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Bioenergy plants › Florida

BIOENERGY PLANTS

Georgia-Pacific Palatka Operations

Georgia-Pacific Palatka Operations is a 79.8 MW operating bioenergy plant in Putnam County, Florida, operated by Georgia-Pacific Consr Ops LLC-Palatka.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 1956 (current stage)
  5. ClosedJun 2016 (not yet reached)

This plant has generators at more than one stage; see the table below.

Open in Google MapsMore bioenergy plants in Florida

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
GEN4Wood/Wood Waste Biomass48 MW OperatingJun 1965
GEN8Wood/Wood Waste Biomass32 MW OperatingMay 1993
GEN3Wood/Wood Waste Biomass14 MW RetiredJun 1956Jan 2007
GEN2Natural Gas Steam Turbine9.7 MW RetiredJun 1956Jun 2016

Plant details

Operator
Georgia-Pacific Consr Ops LLC-Palatka
Location
Putnam County, Florida
Balancing authority
FPL
Sector
Industrial CHP
Capacity
Operating: 79.8 MW
Retired: 23.7 MW
First unit online
Jun 1956
EIA plant ID
10611

Location

29.6807, -81.6809

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem