United States › Power plants › Gas power plants › Texas
GAS POWER PLANTSFormosa Utility Venture Ltd
Formosa Utility Venture Ltd is a 933 MW operating gas power plant in Calhoun County, Texas, operated by Formosa Plastics Corp.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 3TBG1 | Natural Gas Fired Combined Cycle | 102 MW | |
| 3TBG2 | Natural Gas Fired Combined Cycle | 102 MW | |
| TBG6 | Natural Gas Fired Combined Cycle | 86 MW | |
| TBG1 | Natural Gas Fired Combined Cycle | 83 MW | |
| TBG2 | Natural Gas Fired Combined Cycle | 83 MW | |
| TBG3 | Natural Gas Fired Combined Cycle | 83 MW | |
| TBG4 | Natural Gas Fired Combined Cycle | 83 MW | |
| TBG5 | Natural Gas Fired Combined Cycle | 83 MW | |
| ST2 | Natural Gas Fired Combined Cycle | 66 MW | |
| ST3 | Natural Gas Fired Combined Cycle | 55 MW | |
| 3ST1 | Natural Gas Fired Combined Cycle | 40 MW | |
| BO3 | Natural Gas Fired Combined Cycle | 36 MW | |
| ST1 | Natural Gas Fired Combined Cycle | 34 MW |
Plant details
- Operator
- Formosa Plastics Corp
- Location
- Calhoun County, Texas
- Balancing authority
- ERCO
- Sector
- Industrial CHP
- Capacity
- Operating: 933 MW
- First unit online
- Mar 1987
- EIA plant ID
- 10554
Location
28.6917, -96.5417
Nearby power plants
- Tres BahiasSolar farms · 196 MW · 1.9 mi
- CFB Power PlantGas power plants · 310 MW · 2.9 mi
- Calhoun Port ComfortGas power plants · 121 MW · 3.0 mi
- Third Coast BESS, LLCBattery storage · 100 MW · 11.1 mi
- TX2 Port LavacaBattery storage · 9.9 MW · 11.3 mi
- Union Carbide Seadrift CogenGas power plants · 162 MW · 18.7 mi
- BP Chemicals Green Lake PlantOther power plants · 38.8 MW · 19.6 mi
- Seadrift Coke LPOther power plants · 7.6 MW · 19.6 mi
- Regis PalaciosBattery storage · 9.9 MW · 20.5 mi
- Dios BESS, LLCBattery storage · 202 MW · 22.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem