United States βΊ Power plants βΊ Nuclear power plants
OCTARY USA Β· NUCLEAR POWER PLANTSRetired nuclear power plants in the USA
Every US nuclear power plant, operating and retired, plus new reactors in the pipeline. Click a state to drill down, or search near a place.
Operating55plants
Operating capacity102.7 GWnameplate
Under construction0.0 MW0 plants
Whole pipeline4,968 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
11 plants
| Plant | Capacity | Stage |
|---|---|---|
| San Onofre Nuclear Generating Station | 2,254 MW | Closed |
| Indian Point 2 | 1,299 MW | Closed |
| Indian Point 3 | 1,012 MW | Closed |
| Crane Clean Energy Center | 981 MW | Mothballed |
| Crystal River | 890 MW | Closed |
| Duane Arnold Energy Center | 680 MW | Closed |
| Pilgrim Nuclear Power Station | 670 MW | Closed |
| Vermont Yankee | 563 MW | Closed |
| Kewaunee | 560 MW | Closed |
| Oyster Creek | 550 MW | Closed |
| Fort Calhoun | 502 MW | Closed |
Operating capacity by state
Click a state to drill down.
AKβMEβVTβNH1.2GWWA1.2GWIDβMTβNDβMN1.9GWIL12GWWI1.3GWMI4.3GWNY3.4GWRIβMAβORβNVβWYβSDβIAβINβOH2.2GWPA9.5GWNJ3.6GWCT2.3GWCA2.3GWUTβCOβNE801MWMO1.2GWKYβWVβVA3.7GWMD1.9GWDEβAZ4.2GWNMβKS1.3GWAR1.8GWTN5GWNC5.4GWSC6.9GWDCβOKβLA2.2GWMS1.4GWAL5.6GWGA6.5GWHIβTX5.1GWFL3.9GW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Southern California Edison Co1 plants Β· 2,254 MW
- Constellation Nuclear2 plants Β· 1,531 MW
- Entergy Nuclear Indian Point 21 plants Β· 1,299 MW
- Entergy Nuclear Indian Point 31 plants Β· 1,012 MW
- Duke Energy Florida, LLC1 plants Β· 890 MW
- NextEra Energy Duane Arnold LLC1 plants Β· 680 MW
- Entergy Nuclear Generation Co1 plants Β· 670 MW
- Entergy Nuclear Vermont Yankee1 plants Β· 563 MW
- Dominion Energy Kewaunee Inc.1 plants Β· 560 MW
- Omaha Public Power District1 plants Β· 502 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map