United States βΊ Power plants βΊ North Dakota
OCTARY USA Β· POWER PLANTSRetired power plants in North Dakota
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Stanton Coal power plants, Oil-fired power plants |
191 MW | Closed |
| R M Heskett Coal power plants |
115 MW | Closed |
| Grand Forks Oil-fired power plants |
10.6 MW | Closed |
| Williston Gas power plants |
10.0 MW | Closed |
| Glen Ullin Station 6 Other power plants |
5.3 MW | Closed |
| Harwood Oil-fired power plants |
4.8 MW | Closed |
| Minot Wind Project Wind farms |
2.6 MW | Closed |
| Coal Creek Oil-fired power plants |
2.0 MW | Closed |
| Walhalla Coal power plants |
2.0 MW | Closed |
| Pembina Land Port of Entry Wind Turbine Wind farms |
1.0 MW | Closed |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Wind farms4,979 MW Β· +628 MW pipeline
- Coal power plants4,023 MW
- Gas power plants1,546 MW Β· +1,518 MW pipeline
- Hydroelectric plants583 MW
- Solar farms0.0 MW Β· +295 MW pipeline
- Battery storage0.0 MW Β· +240 MW pipeline
- Oil-fired power plants66.7 MW
- Bioenergy plants9.8 MW
- Other power plants9.3 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Great River Energy1 plants Β· 191 MW
- Montana-Dakota Utilities Co3 plants Β· 130 MW
- Minnkota Power Coop, Inc2 plants Β· 15.4 MW
- Basin Electric Power Coop1 plants Β· 2.6 MW
- Archer Daniels Midland Co1 plants Β· 2.0 MW
- Rainbow Energy Center1 plants Β· 2.0 MW
- General Services Administration - Region 81 plants Β· 1.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map