πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Massachusetts

OCTARY USA Β· POWER PLANTS

Cancelled power plants in Massachusetts

Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating687plants
Operating capacity14.0 GWnameplate
Under construction287 MW15 plants
Whole pipeline732 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

11 plants
PlantCapacityStageStateOwner / operatorYear
Stony Brook
Gas power plants, Oil-fired power plants
422 MW Withdrawn / abandoned MA
Hampden
Massachusetts Mun Wholes Electric Co
Canal
Gas power plants
330 MW Withdrawn / abandoned MA
Barnstable
Canal Generating LLC
Palmer Renewable Energy
Bioenergy plants
42.0 MW Withdrawn / abandoned MA
Hampden
Palmer Renewable Energy
Royalston Solar One
Solar farms, Battery storage
7.5 MW Withdrawn / abandoned MA
Worcester
Royalston Solar One, LLC
MA Lanesboro S. Main St.
Solar farms, Battery storage
6.7 MW Withdrawn / abandoned MA
Berkshire
TJA Off South Main St. Lanesboro, LLC
Martha's Vineyard Community Battery
Battery storage
4.9 MW Withdrawn / abandoned MA
Dukes
Eversource
BlueWave Capital-Mattapoisett (SREC II)
Solar farms
4.5 MW Withdrawn / abandoned MA
Plymouth
BWC Origination 5, LLC
Hadley Falls
Hydroelectric plants
3.5 MW Withdrawn / abandoned MA
Hampden
City of Holyoke Gas and Elec Dept - (MA)
Williams College - Campus CHP
Gas power plants, Oil-fired power plants
3.2 MW Withdrawn / abandoned MA
Berkshire
President & Trustees of Williams College
Southbridge Landfill Gas-to-Energy
Bioenergy plants
1.6 MW Withdrawn / abandoned MA
Worcester
Southbridge Recycling and Disposal Park
Riverside Holyoke
Hydroelectric plants
1.1 MW Withdrawn / abandoned MA
Hampden
City of Holyoke Gas and Elec Dept - (MA)

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map