United States βΊ Power plants βΊ Iowa
OCTARY USA Β· POWER PLANTSPlanned and under-construction power plants in Iowa
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Silver Queen Wind Farm Wind farms |
252 MW | In planning |
| Hawkeye Solar II, LLC Solar farms |
250 MW | In planning |
| Hawkeye Solar, LLC Solar farms |
200 MW | In planning |
| Rock Creek Solar Solar farms |
150 MW | Under construction |
| Coggon Solar LLC Solar farms |
100 MW | Under construction |
| Mills Solar Project Solar farms |
50.0 MW | Under construction |
| Muscatine Plant #1 Gas power plants |
35.0 MW | Consented |
| MPW Solar 1 Solar farms |
24.0 MW | Consented |
| Teeple Creek Solar farms |
2.5 MW | Under construction |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Wind farms13.4 GW Β· +252 MW pipeline
- Coal power plants5,228 MW
- Gas power plants4,340 MW Β· +35.0 MW pipeline
- Solar farms701 MW Β· +777 MW pipeline
- Oil-fired power plants903 MW
- Hydroelectric plants183 MW
- Battery storage110 MW
- Bioenergy plants22.7 MW
- Other power plants4.0 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Silver Queen Wind Farm, LLC1 plants Β· 252 MW
- Hawkeye Solar II, LLC1 plants Β· 250 MW
- Hawkeye Solar, LLC1 plants Β· 200 MW
- Rock Creek Solar LLC1 plants Β· 150 MW
- Clenera DevCo LLC1 plants Β· 100 MW
- MidAmerican Energy Co1 plants Β· 50.0 MW
- Board of Water Electric & Communications1 plants Β· 35.0 MW
- MPW Solar 1, LLC1 plants Β· 24.0 MW
- OneEnergy, Inc.1 plants Β· 2.5 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map