United States › Power plants › Missouri
OCTARY USA · POWER PLANTSPower plants in Missouri — page 4
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Walton Street Substation Oil-fired power plants |
2.0 MW | |
| Renewable Energy Center at BJH Solar farms |
1.6 MW | |
| St Joseph Landfill Generating Station Bioenergy plants |
1.6 MW | |
| Cape Girardeau Renewable Energy Center Solar farms |
1.2 MW | |
| IKEA St. Louis 410 Solar farms |
1.0 MW | |
| Macon Oil-fired power plants |
1.0 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants6,684 MW · +2,530 MW pipeline
- Coal power plants9,048 MW
- Solar farms1,899 MW · +2,082 MW pipeline
- Wind farms2,454 MW · +247 MW pipeline
- Nuclear power plants1,236 MW
- Oil-fired power plants1,227 MW
- Hydroelectric plants1,106 MW
- Battery storage0.0 MW · +436 MW pipeline
- Bioenergy plants14.8 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Union Electric Co - (MO)23 plants · 8,612 MW
- Associated Electric Coop, Inc8 plants · 4,219 MW
- Evergy Metro4 plants · 3,350 MW
- Evergy Missouri West8 plants · 1,628 MW
- Empire District Electric Co6 plants · 1,387 MW
- City Utilities of Springfield - (MO)4 plants · 1,101 MW
- Vesper Energy Development LLC2 plants · 800 MW
- Dogwood Power Management, Inc.1 plants · 655 MW
- Swan Solar LLC1 plants · 650 MW
- White Cloud Generating, LLC1 plants · 602 MW
- Beavertail Solar, LLC1 plants · 400 MW
- Enel Green Power NA, Inc.1 plants · 300 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map