United States › Power plants › Minnesota
OCTARY USA · POWER PLANTSOperating power plants in Minnesota — page 17
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Phare Garden Solar farms |
0.9 MW | |
| Pickerel Garden Solar farms |
0.9 MW | |
| Sturgeon Garden Solar farms |
0.9 MW | |
| Winona Garden Solar farms |
0.9 MW | |
| Pillager Hydroelectric plants |
0.8 MW | |
| Rice Two Solar CSG Solar farms |
0.8 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants6,362 MW · +428 MW pipeline
- Wind farms4,965 MW · +428 MW pipeline
- Coal power plants3,251 MW
- Solar farms2,175 MW · +85.1 MW pipeline
- Nuclear power plants1,871 MW
- Battery storage23.0 MW · +827 MW pipeline
- Oil-fired power plants701 MW · +20.1 MW pipeline
- Bioenergy plants386 MW
- Hydroelectric plants218 MW
- Other power plants11.5 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Northern States Power Co - Minnesota27 plants · 8,903 MW
- Great River Energy9 plants · 1,523 MW
- ALLETE, Inc.18 plants · 1,306 MW
- EDF Renewable Asset Holdings, Inc.5 plants · 812 MW
- MEC Holdings, LLC1 plants · 741 MW
- Avangrid Power LLC6 plants · 599 MW
- Minnesota Municipal Power Agny4 plants · 474 MW
- Invenergy Services LLC1 plants · 347 MW
- Cottage Grove Operating Services LLC1 plants · 284 MW
- Nobles 2 Power Partners, LLC1 plants · 250 MW
- Wisconsin Power & Light Co1 plants · 201 MW
- Prairie Rose Wind Farm1 plants · 200 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map