United States › Power plants › Massachusetts
OCTARY USA · POWER PLANTSPower plants in Massachusetts — page 15
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Syncarpha Hancock III CSG Solar farms |
1.0 MW | |
| Tihonet Solar Solar farms |
1.0 MW | |
| Webster Solar Solar farms |
1.0 MW | |
| Wendell MA 1 Solar farms |
1.0 MW | |
| Whatley Renewables Solar farms |
1.0 MW | |
| Woodchuck Solar, LLC CSG Solar farms |
1.0 MW | |
| WYM 1250 Palmer LLC Solar farms |
1.0 MW | |
| ZPD-PT Solar Project 2017-044 LLC CSG Solar farms |
1.0 MW | |
| UMass PV Lot 49 Solar farms |
0.8 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants6,542 MW
- Hydroelectric plants2,101 MW
- Oil-fired power plants1,876 MW
- Solar farms1,507 MW · +57.8 MW pipeline
- Battery storage742 MW · +675 MW pipeline
- Wind farms898 MW
- Bioenergy plants339 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Canal Generating LLC1 plants · 1,495 MW
- FirstLight Power Resources, Inc. - MA4 plants · 1,237 MW
- Calpine Fore River Energy Center, LLC1 plants · 872 MW
- Vineyard Wind 1 LLC1 plants · 800 MW
- Salem Harbor Power Development LP1 plants · 798 MW
- Bear Swamp Power Company LLC2 plants · 677 MW
- Massachusetts Mun Wholes Electric Co6 plants · 635 MW
- Bellingham Power Generation LLC1 plants · 578 MW
- ANP Blackstone Energy Company LLC1 plants · 578 MW
- Constellation Power, Inc3 plants · 441 MW
- Millennium Power Company, LLC1 plants · 428 MW
- Northeast Energy Associates LP1 plants · 386 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map