United States βΊ Power plants
OCTARY USA Β· POWER PLANTSEcoplexus, Inc: operating power plants in the USA
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Calipatria State Prison Solar farms |
6.0 MW | |
| Centinela State Prison Solar farms |
6.0 MW | |
| Cottage Grove CSG, LLC Solar farms |
5.0 MW | |
| Felton CSG PV1-5 Solar farms |
5.0 MW | |
| Fox CSG, LLC Solar farms |
5.0 MW | |
| Randolph CSG PV1-5 Solar farms |
5.0 MW | |
| SunE Feely 1 CSG, LLC Solar farms |
5.0 MW | |
| Wyoming 2 CSG, LLC Solar farms |
5.0 MW | |
| Kern Valley SP Solar farms |
3.0 MW | |
| SunE Stolee CSG, LLC Solar farms |
3.0 MW | |
| Department of Justice Solar farms |
2.4 MW | |
| CSP Los Angeles Solar farms |
2.3 MW | |
| Folsom SP and CSP Sacramento Solar farms |
1.3 MW | |
| Camp San Luis Obispo Solar farms |
1.2 MW | |
| Atascadero State Hospital Solar farms |
1.1 MW | |
| CA Institute for Women Solar farms |
1.0 MW |
Operating capacity by state
Click a state to drill down.
Capacity by technology
Solid: operating. Light: planned or under construction.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Florida Power & Light Co140 plants Β· 40.8 GW
- Tennessee Valley Authority52 plants Β· 36.3 GW
- Duke Energy Carolinas, LLC46 plants Β· 23.9 GW
- Constellation Nuclear12 plants Β· 22.8 GW
- Georgia Power Co44 plants Β· 21.6 GW
- Virginia Electric & Power Co36 plants Β· 20.2 GW
- Alabama Power Co27 plants Β· 16.2 GW
- U S Bureau of Reclamation56 plants Β· 14.7 GW
- Duke Energy Progress - (NC)27 plants Β· 14.3 GW
- RWE Americas, LLC158 plants Β· 14.0 GW
- Southern Power Co53 plants Β· 13.7 GW
- PacifiCorp58 plants Β· 13.6 GW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map