πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants

OCTARY USA Β· POWER PLANTS

Energy Developments, Inc d/b/a EDL: retired power plants in the USA

Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating17plants
Operating capacity77.4 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

11 plants
PlantCapacityStageStateOwner / operatorYear
Loraine County Project
Bioenergy plants
27.2 MW Closed OH
Lorain
Energy Developments, Inc d/b/a EDL 2012
Carbon Limestone
Bioenergy plants
25.6 MW Closed OH
Mahoning
Energy Developments, Inc d/b/a EDL 2012
Tessman Road
Bioenergy plants
9.8 MW Closed TX
Bexar
Energy Developments, Inc d/b/a EDL 2015
Covel Gardens Gas Recovery
Bioenergy plants
9.6 MW Closed TX
Bexar
Energy Developments, Inc d/b/a EDL 2005
Wood Road
Bioenergy plants
8.0 MW Closed MI
Clinton
Energy Developments, Inc d/b/a EDL 2008
Zion Landfill Gas to Energy Facility
Bioenergy plants
7.0 MW Closed IL
Lake
Energy Developments, Inc d/b/a EDL 2007
Middle Point Landfill Gas Recovery
Bioenergy plants
2.8 MW Closed TN
Rutherford
Energy Developments, Inc d/b/a EDL 2000
Ottawa County Project
Bioenergy plants
2.8 MW Closed OH
Ottawa
Energy Developments, Inc d/b/a EDL 2001
Roberts Road Power Plant
Bioenergy plants
1.4 MW Closed GA
Fayette
Energy Developments, Inc d/b/a EDL 2003
Grand River
Bioenergy plants
0.8 MW Closed MI
Clinton
Energy Developments, Inc d/b/a EDL 1991
Grand Blanc Generating Station
Bioenergy plants
0.6 MW Closed MI
Genesee
Energy Developments, Inc d/b/a EDL 2010

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map