United States βΊ Power plants
OCTARY USA Β· POWER PLANTSLeeward Asset Management, LLC: cancelled power plants in the USA
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Owens Creek Solar Solar farms |
500 MW | Withdrawn / abandoned |
| Cradle Solar Solar farms |
225 MW | Withdrawn / abandoned |
| Sandhill Solar 2 Solar farms |
200 MW | Withdrawn / abandoned |
| Rose Gold Solar Solar farms |
150 MW | Withdrawn / abandoned |
| Buena Vista Energy LLC Battery storage |
100 MW | Withdrawn / abandoned |
| Morley Solar Solar farms |
100 MW | Withdrawn / abandoned |
| Thoroughbred Solar Solar farms |
50.0 MW | Withdrawn / abandoned |
| Barilla Solar Battery storage |
20.0 MW | Withdrawn / abandoned |
| Portal Ridge Solar A, LLC Solar farms |
19.0 MW | Withdrawn / abandoned |
Operating capacity by state
Click a state to drill down.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Solar farms1,933 MW Β· +2,129 MW pipeline
- Wind farms2,033 MW Β· +370 MW pipeline
- Battery storage347 MW Β· +328 MW pipeline
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Luminant Generation Company LLC11 plants Β· 7,776 MW
- Solar Proponent LLC6 plants Β· 5,124 MW
- Seminole Electric Cooperative Inc4 plants Β· 4,124 MW
- Duke Energy Progress - (NC)5 plants Β· 4,007 MW
- Florida Power & Light Co4 plants Β· 3,939 MW
- Tampa Electric Co7 plants Β· 3,859 MW
- Duke Energy Indiana, LLC1 plants Β· 3,685 MW
- Duke Energy Florida, LLC2 plants Β· 3,534 MW
- Southern Power Co5 plants Β· 2,940 MW
- Georgia Power Co6 plants Β· 2,735 MW
- Dominion Energy South Carolina, Inc4 plants Β· 2,710 MW
- Nevada Power Co3 plants Β· 2,580 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map