United States β€Ί Power plants

OCTARY USA Β· POWER PLANTS

Entergy Louisiana LLC: planned power plants in the USA

Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating16plants
Operating capacity12.8 GWnameplate
Under construction0.0 MW0 plants
Whole pipeline10.4 GWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

11 plants
PlantCapacityStageStateOwner / operatorYear
Pointe Coupee Power Station
Gas power plants
2,341 MW In planning LA
Pointe Coupee
Entergy Louisiana LLC 2031
Franklin Farms 1&2
Gas power plants
1,561 MW In planning LA
Richland
Entergy Louisiana LLC 2028
Richland Parish Power Station 1&2
Gas power plants
1,561 MW In planning LA
Richland
Entergy Louisiana LLC 2030
Waterford 6
Gas power plants
820 MW In planning LA
St Charles
Entergy Louisiana LLC 2030
Westlake Power Station
Gas power plants
819 MW In planning LA
Calcasieu
Entergy Louisiana LLC 2030
Richland Parish Power Station 3
Gas power plants
780 MW In planning LA
Richland
Entergy Louisiana LLC 2030
Richland Parish Power Station 4
Gas power plants
780 MW In planning LA
Richland
Entergy Louisiana LLC 2030
Cypress Harvest Solar Station
Solar farms, Battery storage
400 MW In planning LA
Iberville
Entergy Louisiana LLC 2029
Bogalusa West Solar Station
Solar farms
200 MW In planning LA
Washington
Entergy Louisiana LLC 2028
Segno Solar Station
Solar farms
170 MW In planning TX
Polk
Entergy Louisiana LLC 2029
Votaw Solar Station
Solar farms
141 MW In planning TX
Hardin
Entergy Louisiana LLC 2029

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map