United States βΊ Grid βΊ Transmission lines βΊ Utah
OCTARY USA Β· TRANSMISSION345 kV transmission lines in Utah
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Mona β Bonanza | 345 kV | 275 km |
| Red Butte β Sigurd | 345 kV | 273 km |
| Huntington β Pinto | 345 kV | 256 km |
| Three Peaks β Sigurd | 345 kV | 179 km |
| Red Butte β Harry Allen | 345 kV | 166 km |
| Pinto β Four Corners | 345 kV | 163 km |
| Bonanza β Bears Ears | 345 kV | 162 km |
| Populus β Ben Lomond | 345 kV | 145 km |
| Intermountain β Mildford Wind | 345 kV | 143 km |
| Populus β Ben Lomond | 345 kV | 138 km |
| Emery β Spanish Fork | 345 kV | 138 km |
| Populus β Ben Lomond | 345 kV | 132 km |
| Huntington β Spanish Fork | 345 kV | 126 km |
| Emery β Sigurd | 345 kV | 120 km |
| Emery β Sigurd | 345 kV | 120 km |
| Sigurd β Clover | 345 kV | 109 km |
| Sigurd β Clover | 345 kV | 108 km |
| Mona β Huntington | 345 kV | 96.4 km |
| Intermountain β Mona | 345 kV | 81.1 km |
| Intermountain β Mona | 345 kV | 81.0 km |
| Mona β Camp Williams | 345 kV | 76.0 km |
| Ben Lomond β Terminal | 345 kV | 75.4 km |
| Ben Lomond β Terminal | 345 kV | 75.4 km |
| Ben Lomond β Terminal | 345 kV | 75.2 km |
| Mona β Camp Williams | 345 kV | 75.1 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Pacificorp3,319 km Β· 3,319 km at 345 kV+
- Utah Municipal Power Agency275 km Β· 275 km at 345 kV+
- Intermountain Power Agency168 km Β· 168 km at 345 kV+
- Tri-state G & T Assn, Inc162 km Β· 162 km at 345 kV+
- First Wind143 km Β· 143 km at 345 kV+
- Cache Valley Electric3.5 km Β· 3.5 km at 345 kV+
- Northern Wasco County PUD0.6 km Β· 0.6 km at 345 kV+
- Deseret Generation & Tran Coop0.5 km Β· 0.5 km at 345 kV+
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants