United States › Grid › Transmission lines › Utah

OCTARY USA · TRANSMISSION

220–287 kV transmission lines in Utah

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections101mapped segments
Route length1,971 km1,225 mi
345 kV and above5,643 kmthe backbone
Owners9utilities and others

Map

Loading lines…
500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Sigurd – Glen Canyon230 kV257 km PacificorpUT, AZ
Intermountain – Gonder230 kV228 km Intermountain Power AgencyUT, NV
Oceola230 kV162 km PacificorpUT, NV
Sigurd – Parowan230 kV152 km PacificorpUT
Ben Lomond230 kV142 km PacificorpWY, UT
Ben Lomond – Birch Creek230 kV88.6 km PacificorpUT
Sigurd – Pavant230 kV69.3 km PacificorpUT
Birch Creek230 kV53.0 km PacificorpWY, UT
Substation names not reported230 kV52.6 km PacificorpUT
Ben Lomond – Parrish230 kV52.4 km PacificorpUT
Substation names not reported230 kV47.5 km PacificorpID, UT
Substation names not reported230 kV47.5 km PacificorpID, UT
Substation names not reported230 kV47.5 km PacificorpID, UT
Malad230 kV42.2 km PacificorpID, UT
West Cedar – Parowan230 kV41.4 km PacificorpUT
Brigham230 kV36.4 km Brigham City CorporationUT
Pavant230 kV35.1 km PacificorpUT
Substation names not reported230 kV27.3 km PacificorpUT
Honeyville230 kV22.3 km PacificorpUT
Flaming Gorge – Little Mountain230 kV21.5 km PacificorpWY, UT
Parrish230 kV20.7 km PacificorpUT
Substation names not reported230 kV20.0 km PacificorpUT
Ben Lomond – White Rock230 kV16.0 km PacificorpUT
St George230 kV14.7 km Dixie Escalante R E A, IncUT
Substation names not reported230 kV13.4 km PacificorpUT

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants