United States › Grid › Transmission lines › Nevada

OCTARY USA · TRANSMISSION

220–287 kV transmission lines in Nevada

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections105mapped segments
Route length3,617 km2,248 mi
345 kV and above8,338 kmthe backbone
Owners10utilities and others

Map

Loading lines…
HVDC500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Victorville – Mead230 kV281 km LadwpNV, CA
Intermountain – Gonder230 kV228 km Intermountain Power AgencyUT, NV
Substation names not reported220 kV175 km Southern California EdisonNV, CA
Oceola230 kV162 km PacificorpUT, NV
Austin230 kV140 km Sierra Pacific Power CompanyNV
Pahrump – Mead230 kV136 km Owner not reportedNV
Mead230 kV124 km Owner not reportedCA, NV
Mead230 kV123 km Owner not reportedNV, CA
Gonder – Machacek230 kV107 km Mt. Wheeler PowerNV
Mead230 kV97.2 km Owner not reportedAZ, NV
Frontier230 kV91.9 km Sierra Pacific Power CompanyNV
Mccullough230 kV90.0 km Owner not reportedAZ, NV
Cima230 kV78.7 km Owner not reportedNV, CA
Machacek – Frontier230 kV78.7 km Owner not reportedNV
Desert View – Innovation230 kV59.7 km Nevada Power CompanyNV
Arden230 kV59.1 km Nevada Power CompanyNV
Arden230 kV59.1 km Nevada Power CompanyNV
Substation names not reported230 kV55.7 km Sierra Pacific Power CompanyNV
Pahrump – Innovation230 kV52.6 km Owner not reportedNV
Ivanpah230 kV51.6 km Southern California EdisonCA, NV
Ivanpah230 kV51.6 km Southern California EdisonCA, NV
Anaconda230 kV50.7 km Sierra Pacific Power CompanyNV
Oceola – Gonder230 kV44.5 km Mt Wheeler Power, IncNV
Reid Gardner230 kV39.9 km Owner not reportedNV
Reid Gardner230 kV39.8 km Owner not reportedNV

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants