United States βΊ Grid βΊ Transmission lines βΊ Kentucky
OCTARY USA Β· TRANSMISSION345 kV transmission lines in Kentucky
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Miami β West Milton | 345 kV | 116 km |
| Clifty Creek β Pierce | 345 kV | 112 km |
| Clifty Creek β Pierce | 345 kV | 112 km |
| Brown Plant β Hardin | 345 kV | 112 km |
| Daviess County β Hardin | 345 kV | 93.6 km |
| Brown Plant | 345 kV | 87.1 km |
| Shawnee β West Frankfort East | 345 kV | 85.7 km |
| Hardin | 345 kV | 84.6 km |
| Ghent Station | 345 kV | 83.7 km |
| Pineville | 345 kV | 77.7 km |
| Pineville | 345 kV | 77.6 km |
| Substation names not reported | 345 kV | 72.6 km |
| Ghent Station β Trimble County Station | 345 kV | 69.9 km |
| West Garrard | 345 kV | 67.4 km |
| Ghent Station | 345 kV | 66.5 km |
| Ghent Station β Batesville | 345 kV | 62.5 km |
| Miami β Woodsdale | 345 kV | 61.5 km |
| J K Smith (345 Kv) β West Garrard | 345 kV | 57.3 km |
| Terminal | 345 kV | 56.1 km |
| Pierce | 345 kV | 53.8 km |
| Middletown 345 Kv β Mill Creek Station | 345 kV | 50.5 km |
| Wilson | 345 kV | 45.7 km |
| Middletown 345 Kv β Trimble County Station | 345 kV | 45.1 km |
| Brown (345 Kv) | 345 kV | 41.9 km |
| Substation names not reported | 345 kV | 41.8 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Kentucky Utilities Co329 km Β· 329 km at 345 kV+
- East Kentucky Power Coop, Inc290 km Β· 290 km at 345 kV+
- Duke Energy214 km Β· 214 km at 345 kV+
- Ameren Illinois Company100 km Β· 100 km at 345 kV+
- Louisville Gas & Electric Co97.5 km Β· 97.5 km at 345 kV+
- Southern Indiana Gas & Elec Co41.9 km Β· 41.9 km at 345 kV+
- Kentucky Power Co4.4 km Β· 4.4 km at 345 kV+
- Duke Energy Ohio Inc0.2 km Β· 0.2 km at 345 kV+
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants