United States βΊ Grid βΊ Transmission lines βΊ Kansas
OCTARY USA Β· TRANSMISSION345 kV transmission lines in Kansas
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Post Rock β Axtell | 345 kV | 221 km |
| Hitchland | 345 kV | 190 km |
| Thistle β Woodward | 345 kV | 172 km |
| Thistle β Woodward | 345 kV | 172 km |
| Wolf Creek β Benton | 345 kV | 158 km |
| Rose Hill β Wolf Creek | 345 kV | 157 km |
| Summit β Jeffrey | 345 kV | 156 km |
| Lang β Wichita | 345 kV | 153 km |
| Post Rock β Spearville | 345 kV | 143 km |
| Thistle β Clark County | 345 kV | 138 km |
| Thistle β Clark County | 345 kV | 138 km |
| Neosho β La Cygne | 345 kV | 135 km |
| Neosho | 345 kV | 122 km |
| Red Willow β Mingo | 345 kV | 120 km |
| Thistle | 345 kV | 107 km |
| Thistle | 345 kV | 107 km |
| Rose Hill β Charles D. Lamb Energy Center | 345 kV | 100 km |
| Ninnescah Wind Energy, Llc | 345 kV | 97.5 km |
| Setab β Mingo | 345 kV | 93.6 km |
| Morris β Jeffrey | 345 kV | 91.5 km |
| La Cygne | 345 kV | 86.9 km |
| Swissvale β Stilwell | 345 kV | 83.4 km |
| Elm Creek β Summit | 345 kV | 82.0 km |
| Neosho β Delaware | 345 kV | 77.4 km |
| Reno β Wichita | 345 kV | 69.6 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Evergy Kansas South, Inc1,018 km Β· 1,018 km at 345 kV+
- Westar Energy Inc771 km Β· 771 km at 345 kV+
- Southern Pioneer Electric Company766 km Β· 766 km at 345 kV+
- Midwest Energy Inc642 km Β· 642 km at 345 kV+
- Kansas City Power & Light Co142 km Β· 142 km at 345 kV+
- Pioneer Electric Coop, Inc - (ks)118 km Β· 118 km at 345 kV+
- Oklahoma Gas & Electric Co52.3 km Β· 52.3 km at 345 kV+
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants