220–287 kV transmission lines in Idaho

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections112mapped segments
Route length4,352 km2,704 mi
345 kV and above3,233 kmthe backbone
Owners5utilities and others

Map

Loading lines…
500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Mill Creek Generating Station – Amps230 kV252 km Northwestern Energy LLC - (mt)MT, ID
Hunter Creek – Lolo230 kV172 km Idaho Power CoID, OR
Midpoint – Boise Bench230 kV171 km Idaho Power CoID
Brownlee – Boise Bench230 kV165 km Idaho Power CoID, OR
Brownlee – Boise Bench230 kV161 km Idaho Power CoID, OR
Brownlee – Boise Bench230 kV161 km Idaho Power CoID, OR
Boise Bench – Horse Flat230 kV134 km Idaho Power CoID
Substation names not reported230 kV132 km Idaho Power CoID
Substation names not reported230 kV126 km PacificorpWY, ID
Lancaster – Noxon230 kV117 km Bonneville Power AdministrationID, MT
Midpoint230 kV107 km Idaho Power CoID
Sunbeam230 kV95.1 km PacificorpID
Brady – Antelope230 kV91.0 km Idaho Power CoID
American Falls – Malad230 kV90.0 km PacificorpID
Lost River – Spar Canyon230 kV85.6 km Bonneville Power AdministrationID
Lost River – Spar Canyon230 kV85.6 km Bonneville Power AdministrationID
Brownlee230 kV83.5 km Idaho Power CoID, OR
Moscow230 kV71.5 km Avista CorpID
Goshen230 kV70.7 km PacificorpID
Amps – Antelope230 kV69.9 km PacificorpID
Noxon – Pine Creek230 kV69.3 km Avista CorpID, MT
Benewah – Pine Creek230 kV68.9 km Avista CorpID
Boise Bench230 kV63.5 km Idaho Power CoID
Mora230 kV63.4 km Idaho Power CoID
Borah – Adelaide230 kV61.5 km Idaho Power CoID

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants