United States › Grid › Transmission lines › Colorado
OCTARY USA · TRANSMISSION220–287 kV transmission lines in Colorado
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Line sections301mapped segments
Route length6,895 km4,284 mi
345 kV and above2,396 kmthe backbone
Owners12utilities and others
Map
Loading lines…
345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported
Longest high-voltage lines
220 kV and above, highest voltage first
| Between | Voltage | Length |
|---|---|---|
| Walsenburg – Gladstone | 230 kV | 187 km |
| Lamar Hvdc Tie – Boone | 230 kV | 159 km |
| Archer – North Park | 230 kV | 155 km |
| Curecanti – Lost Canyon | 230 kV | 152 km |
| North Park | 230 kV | 135 km |
| Poncha – Curecanti | 230 kV | 133 km |
| Rifle Psco – Curecanti | 230 kV | 130 km |
| Substation names not reported | 230 kV | 125 km |
| Substation names not reported | 230 kV | 123 km |
| Landsman Creek – Big Sandy | 230 kV | 121 km |
| Midway – Lincoln | 230 kV | 113 km |
| Story – Henry Lake | 230 kV | 111 km |
| Pawnee – Fort Lupton | 230 kV | 105 km |
| North Yuma | 230 kV | 103 km |
| Poncha – San Luis Valley | 230 kV | 100 km |
| Hayden – North Park | 230 kV | 98.6 km |
| Hopkins – Malta | 230 kV | 95.9 km |
| Lost Canyon – Shiprock | 230 kV | 94.8 km |
| Wolcott | 230 kV | 91.3 km |
| Hayden – Gore Pass | 230 kV | 89.8 km |
| Missle Site – Sulphur | 230 kV | 88.1 km |
| Pawnee – Missle Site | 230 kV | 84.8 km |
| Basalt – Malta | 230 kV | 82.0 km |
| Midway – Comanche | 230 kV | 78.6 km |
| Midway – Comanche | 230 kV | 78.5 km |
Line length by state
Click a state to drill down.
AK251 kmME–VT65 kmNH471 kmWA7.9k kmID3.4k kmMT4.7k kmND4.3k kmMN3.7k kmIL224 kmWI152 kmMI108 kmNY1.9k kmRI–MA220 kmOR4.9k kmNV2.8k kmWY5.8k kmSD3.4k kmIA153 kmIN1.3k kmOH–PA4.6k kmNJ2.8k kmCT–CA20k kmUT1.9k kmCO6.4k kmNE1.6k kmMO–KY–WV–VA3.9k kmMD2.5k kmDE504 kmAZ4.5k kmNM1.1k kmKS1.2k kmAR465 kmTN196 kmNC8.5k kmSC6.5k kmDC34 kmOK116 kmLA3.4k kmMS2.1k kmAL3.9k kmGA7.5k kmHI–TX3k kmFL11k km
Largest owners
By route length in this view. Click to map their lines.
- Public Service Co Of Colorado3,201 km
- WAPA-- Western Area Power Administration1,687 km
- Tri-state G & T Assn, Inc1,408 km
- Platte River Power Authority320 km
- City Of Colorado Springs - (Co)189 km
- High West Energy, Inc35.7 km
- Southeast Colorado Power Assn20.8 km
- Northern Wasco County PUD12.4 km
- United Power, Inc11.3 km
- Poudre Valley Rea, Inc7.2 km
- Morgan County Rural Elec Assn2.0 km
- Black Hills/colorado Elec.util0.5 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants