πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Transmission lines

OCTARY USA Β· TRANSMISSION

Pacificorp: 345 kV transmission lines in the USA

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections70mapped segments
Route length4,288 km2,665 mi
345 kV and above5,367 kmthe backbone
Owners1utilities and others

Map

Loading lines…
500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Jim Bridger – Populus345 kV310 km PacificorpID, WY
Jim Bridger – Populus345 kV310 km PacificorpID, WY
Red Butte – Sigurd345 kV273 km PacificorpUT
Huntington – Pinto345 kV256 km PacificorpUT
Three Peaks – Sigurd345 kV179 km PacificorpUT
Red Butte – Harry Allen345 kV166 km PacificorpNV, UT
Pinto – Four Corners345 kV163 km PacificorpUT, NM
Populus – Ben Lomond345 kV145 km PacificorpID, UT
Populus – Ben Lomond345 kV138 km PacificorpID, UT
Emery – Spanish Fork345 kV138 km PacificorpUT
Populus – Ben Lomond345 kV132 km PacificorpID, UT
Huntington – Spanish Fork345 kV126 km PacificorpUT
Emery – Sigurd345 kV120 km PacificorpUT
Emery – Sigurd345 kV120 km PacificorpUT
Sigurd – Clover345 kV109 km PacificorpUT
Sigurd – Clover345 kV108 km PacificorpUT
Mona – Huntington345 kV96.4 km PacificorpUT
Mona – Camp Williams345 kV76.0 km PacificorpUT
Populus – Borah345 kV75.9 km PacificorpID
Populus – Borah345 kV75.9 km PacificorpID
Ben Lomond – Terminal345 kV75.4 km PacificorpUT
Ben Lomond – Terminal345 kV75.4 km PacificorpUT
Ben Lomond – Terminal345 kV75.2 km PacificorpUT
Mona – Camp Williams345 kV75.1 km PacificorpUT
Red Butte – Three Peaks345 kV73.8 km PacificorpUT

Line length by state

Click a state to drill down.

Largest owners

By route length in this view. Click to map their lines.

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants