Pacificorp: Transmission lines in Wyoming

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections359mapped segments
Route length6,343 km3,941 mi
345 kV and above623 kmthe backbone
Owners1utilities and others

Map

Loading lines…
345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Jim Bridger – Populus345 kV310 km PacificorpID, WY
Jim Bridger – Populus345 kV310 km PacificorpID, WY
Jim Bridger345 kV0.6 km PacificorpWY
Jim Bridger345 kV0.5 km PacificorpWY
Jim Bridger345 kV0.5 km PacificorpWY
Jim Bridger345 kV0.5 km PacificorpWY
Riverton230 kV177 km PacificorpWY
Ben Lomond230 kV142 km PacificorpWY, UT
Substation names not reported230 kV126 km PacificorpWY, ID
Mustang – Spence230 kV123 km PacificorpWY
Jim Bridger – Mustang230 kV117 km PacificorpWY
Windstar230 kV111 km PacificorpWY
Rock Springs – Atlantic City230 kV111 km PacificorpWY
Sheridan230 kV100 km PacificorpWY, MT
Frannie230 kV89.0 km PacificorpWY, MT
Substation names not reported230 kV88.7 km PacificorpWY
Riverton – Thermopolis230 kV81.8 km PacificorpWY
Kaycee – Buffalo230 kV73.9 km PacificorpWY
Yellowcake – Antelope Mine230 kV72.3 km PacificorpWY
Difficulty230 kV71.3 km PacificorpWY
Oregon Basin – Garland230 kV67.9 km PacificorpWY
Buffalo – Carr Draw230 kV67.5 km PacificorpWY
Grass Creek – Oregon Basin230 kV66.7 km PacificorpWY
Buffalo – Sheridan230 kV64.0 km PacificorpWY
Substation names not reported230 kV63.2 km PacificorpWY

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants