United States β€Ί Grid β€Ί Transmission lines β€Ί Nevada

OCTARY USA Β· TRANSMISSION

Owner not reported: Transmission lines in Nevada

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections85mapped segments
Route length4,387 km2,726 mi
345 kV and above2,165 kmthe backbone
Owners1utilities and others

Map

Loading lines…
500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Mead500 kV390 km Owner not reportedAZ, NV
Substation names not reported500 kV346 km Owner not reportedAZ, NV
Robinson500 kV326 km Owner not reportedNV
Substation names not reported500 kV42.8 km Owner not reportedNV
Substation names not reported500 kV0.5 km Owner not reportedNV
Midpoint – Humboldt345 kV285 km Owner not reportedID, NV
Robinson – Falcon345 kV280 km Owner not reportedNV
Fort Sage345 kV188 km Owner not reportedNV, CA
Peacock – Mead345 kV141 km Owner not reportedAZ, NV
Substation names not reported345 kV66.3 km Owner not reportedNV
Fort Sage345 kV52.8 km Owner not reportedCA, NV
Humboldt345 kV46.0 km Owner not reportedNV
Pahrump – Mead230 kV136 km Owner not reportedNV
Mead230 kV124 km Owner not reportedCA, NV
Mead230 kV123 km Owner not reportedNV, CA
Mead230 kV97.2 km Owner not reportedAZ, NV
Mccullough230 kV90.0 km Owner not reportedAZ, NV
Cima230 kV78.7 km Owner not reportedNV, CA
Machacek – Frontier230 kV78.7 km Owner not reportedNV
Pahrump – Innovation230 kV52.6 km Owner not reportedNV
Reid Gardner230 kV39.9 km Owner not reportedNV
Reid Gardner230 kV39.8 km Owner not reportedNV
Hoover230 kV37.0 km Owner not reportedNV
Hoover230 kV36.9 km Owner not reportedNV
Crystal230 kV31.4 km Owner not reportedNV

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants