United States βΊ Grid βΊ Transmission lines
OCTARY USA Β· TRANSMISSIONLadwp: 500 kV transmission lines in the USA
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Line sections7mapped segments
Route length1,490 km926 mi
345 kV and above1,490 kmthe backbone
Owners1utilities and others
Map
Loading linesβ¦
500 kV220β287 kV100β161 kV
Longest high-voltage lines
220 kV and above, highest voltage first
| Between | Voltage | Length |
|---|---|---|
| Adelanto β Mccullough | 500 kV | 325 km |
| Adelanto | 500 kV | 273 km |
| Mccullough β Victorville | 500 kV | 259 km |
| Mccullough β Victorville | 500 kV | 259 km |
| Rinaldi β Victorville | 500 kV | 138 km |
| Rinaldi β Adelanto | 500 kV | 125 km |
| Adelanto | 500 kV | 111 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Bonneville Power Administration7,736 km Β· 7,736 km at 345 kV+
- Tennessee Valley Authority3,020 km Β· 3,020 km at 345 kV+
- Southern California Edison2,382 km Β· 2,382 km at 345 kV+
- Pacific Gas & Electric Company2,259 km Β· 2,259 km at 345 kV+
- Georgia Power Co2,131 km Β· 2,131 km at 345 kV+
- Virginia Electric & Power Co1,626 km Β· 1,626 km at 345 kV+
- Intermountain Power Agency1,572 km Β· 1,572 km at 345 kV+
- Ladwp1,490 km Β· 1,490 km at 345 kV+
- Entergy Arkansas Inc1,318 km Β· 1,318 km at 345 kV+
- Florida Power & Light Co1,140 km Β· 1,140 km at 345 kV+
- Pacificorp1,079 km Β· 1,079 km at 345 kV+
- Arizona Public Service Company753 km Β· 753 km at 345 kV+
- Alabama Power Co701 km Β· 701 km at 345 kV+
- Entergy Louisiana LLC585 km Β· 585 km at 345 kV+
- Duke Energy Carolinas, LLC559 km Β· 559 km at 345 kV+
- PPL Electric Utilities Corp540 km Β· 540 km at 345 kV+
- Entergy Mississippi Inc454 km Β· 454 km at 345 kV+
- The Potomac Edison Co449 km Β· 449 km at 345 kV+
- Navajo Tribal Utility Authority412 km Β· 412 km at 345 kV+
- Northwestern Energy LLC - (mt)367 km Β· 367 km at 345 kV+
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants