United States › Grid › Transmission lines
OCTARY USA · TRANSMISSIONLadwp: 220–287 kV transmission lines in the USA
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Line sections15mapped segments
Route length1,096 km681 mi
345 kV and above1,490 kmthe backbone
Owners1utilities and others
Map
Loading lines…
500 kV220–287 kV100–161 kV
Longest high-voltage lines
220 kV and above, highest voltage first
| Between | Voltage | Length |
|---|---|---|
| Victorville – Mead | 230 kV | 281 km |
| Substation names not reported | 230 kV | 255 km |
| Victorville | 287 kV | 135 km |
| Victorville | 287 kV | 135 km |
| Haskell Canyon Swtiching Station | 230 kV | 97.6 km |
| Station J – Haskell Canyon Swtiching Station | 230 kV | 34.4 km |
| Rinaldi – Haskell Canyon Swtiching Station | 230 kV | 25.6 km |
| Olive – Haskell Canyon Swtiching Station | 230 kV | 19.9 km |
| Olive – Haskell Canyon Swtiching Station | 230 kV | 19.9 km |
| Castaic – Haskell Canyon Swtiching Station | 230 kV | 19.3 km |
| Castaic – Haskell Canyon Swtiching Station | 230 kV | 19.3 km |
| Control Gorge | 230 kV | 15.3 km |
| Haskell Canyon Swtiching Station | 230 kV | 14.0 km |
| Pinetree | 230 kV | 13.3 km |
| Control Gorge – Upper Gorge | 230 kV | 12.4 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Bonneville Power Administration9,065 km
- Pacific Gas & Electric Company7,383 km
- Georgia Power Co7,157 km
- Pacificorp6,922 km
- WAPA-- Western Area Power Administration6,766 km
- Virginia Electric & Power Co4,847 km
- Duke Energy Carolinas, LLC3,729 km
- Florida Power & Light Co3,525 km
- Alabama Power Co3,227 km
- Public Service Co Of Colorado3,201 km
- Progress Energy Carolinas Inc2,976 km
- Duke Energy Florida, LLC2,839 km
- Otter Tail Power Co2,819 km
- Idaho Power Co2,431 km
- Southern California Edison2,288 km
- Duke Energy Progress - (nc)2,091 km
- Northwestern Energy LLC - (mt)1,940 km
- Tri-state G & T Assn, Inc1,623 km
- South Carolina Electric&gas Company1,268 km
- PPL Electric Utilities Corp1,218 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues · US power plants