United States βΊ Grid βΊ Transmission lines βΊ Illinois
OCTARY USA Β· TRANSMISSIONCommonwealth Edison Co: Transmission lines in Illinois
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Collins β Plano (765 Kv) | 765 kV | 55.6 km |
| Dresden Station | 345 kV | 94.2 km |
| Goodings Grove β Top Crop | 345 kV | 86.3 km |
| Pontiac Midpoint β Dresden Station | 345 kV | 69.9 km |
| Silver Lake | 345 kV | 64.7 km |
| Nelson | 345 kV | 63.9 km |
| Wayne β Libertyville | 345 kV | 58.7 km |
| Sterling Steel β Quad Cities | 345 kV | 53.3 km |
| Davis Creek | 345 kV | 52.7 km |
| Davis Creek | 345 kV | 52.6 km |
| Skokie (345 Kv) | 345 kV | 44.1 km |
| Wolfs Crossing β Dresden Station | 345 kV | 40.1 km |
| Wolfs Crossing β Dresden Station | 345 kV | 40.1 km |
| Braidwood β Davis Creek | 345 kV | 37.2 km |
| Braidwood β Davis Creek | 345 kV | 37.1 km |
| Northbrook | 345 kV | 35.3 km |
| Byron β Cherry Valley | 345 kV | 34.9 km |
| Byron β Cherry Valley | 345 kV | 34.8 km |
| Goodings Grove | 345 kV | 33.1 km |
| Lockport | 345 kV | 31.5 km |
| Lockport | 345 kV | 31.4 km |
| Bedford Park β Goodings Grove | 345 kV | 30.1 km |
| Zion β Libertyville | 345 kV | 30.0 km |
| Bedford Park β Goodings Grove | 345 kV | 30.0 km |
| Silver Lake β Libertyville | 345 kV | 28.7 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Ameren Illinois Company16,544 km Β· 2,602 km at 345 kV+
- Commonwealth Edison Co4,947 km Β· 1,958 km at 345 kV+
- Midamerican Energy Co448 km Β· 192 km at 345 kV+
- Comed317 km Β· 317 km at 345 kV+
- American Transmission Co179 km Β· 163 km at 345 kV+
- Union Electric Co - (mo)170 km
- Ameren135 km Β· 121 km at 345 kV+
- Gridliance87.5 km
- Northern Indiana Pub Serv Co50.0 km Β· 50.0 km at 345 kV+
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants