United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

SOLAR Β· MISO

Solar project J3921, Jasper County

Solar project J3921, Jasper County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Jasper County, Iowa, connecting to MIDAMERICAN ENERGY CO..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3921
Grid region
MISO (Midcontinent)
Utility / transmission owner
MIDAMERICAN ENERGY CO.
Connection point (POI)
BONDURANT - MONTEZUMA 345.0kV
Location
Jasper County, Iowa
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
7 March 2025
Proposed online date
September 2027
Withdrawn
December 2025

Location

Marker shows the centre of Jasper County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem