SOLAR Β· WESTSolar project 186, Missoula County
Solar project 186, Missoula County is a 3.0 MW solar request withdrawn in the West interconnection queue, in Missoula County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2015 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 186
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- Bonner Substation, Missoula
- Location
- Missoula County, Montana
- Technology
- Solar: 3.0 MW
- Total requested
- 3.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 20 February 2015
- Proposed online date
- April 2016
Location
Marker shows the centre of Missoula County; the queue data does not give exact sites.
Other requests in Missoula County
- Battery storage project 425, Missoula CountyBattery storage Β· 200 MW Β· withdrawn
- Battery storage project 383, Missoula CountyBattery storage Β· 30.0 MW Β· withdrawn
- Solar project 184, Missoula CountySolar Β· 3.0 MW Β· withdrawn
- Solar project 185, Missoula CountySolar Β· 3.0 MW Β· withdrawn
- Other project 29, Missoula CountyOther Β· 1.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem