United States βΊ Grid βΊ Interconnection queues βΊ Missouri
BATTERY STORAGE Β· SPPBattery storage project GEN-2022-140, Johnson County
Battery storage project GEN-2022-140, Johnson County is a 90.0 MW battery storage request withdrawn in the SPP interconnection queue, in Johnson County, Missouri, connecting to KCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-140
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Connection point (POI)
- Post Oak 69 kV Substation
- Location
- Johnson County, Missouri
- Technology
- Battery: 90.0 MW
- Total requested
- 90.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 February 2023
- Proposed online date
- December 2027
- Withdrawn
- November 2023
Location
Marker shows the centre of Johnson County; the queue data does not give exact sites.
Other requests in Johnson County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem