Brookhaven Energy Ext.

Brookhaven Energy Ext. is a 300 MW other request withdrawn in the NYISO interconnection queue, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
49
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
PP&L Global, Inc.
Connection point (POI)
Brookhaven
Location
New York
Technology
Other: 300 MW
Total requested
300 MW
Queue status
Withdrawn
Entered queue
10 February 2000

Location

No county location in the queue data.

Power plants in New York Β· Transmission lines in New York

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem