ONSHORE WIND Β· WEST

Onshore wind project 2008-G7

Onshore wind project 2008-G7 is a 100 MW onshore wind request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2008-G7
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Oasis Sub (230-kV)
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
20 February 2008
Proposed online date
March 2011

Location

No county location in the queue data.

Power plants in Β· Transmission lines in