United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G0288, Pacific County

Onshore wind project G0288, Pacific County is a 82.0 MW onshore wind request withdrawn in the West interconnection queue, in Pacific County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0288
Grid region
West (non-ISO utilities)
Connection point (POI)
One mile from Naselle 115 kV Substation
Location
Pacific County, Washington
Technology
Wind: 82.0 MW
Total requested
82.0 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
24 August 2007
Proposed online date
July 2011

Location

Marker shows the centre of Pacific County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Pacific County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem