United States βΊ Grid βΊ Interconnection queues βΊ Iowa
SOLAR Β· MISOSolar project J2108, Johnson County
Solar project J2108, Johnson County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Johnson County, Iowa, connecting to MIDAMERICAN ENERGY CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2108
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- IC ENRON - SUB JIC 161 kV
- Location
- Johnson County, Iowa
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 9 August 2021
- Proposed online date
- November 2024
- Withdrawn
- October 2023
Location
Marker shows the centre of Johnson County; the queue data does not give exact sites.
Other requests in Johnson County
- Other project J953, Johnson CountyOther Β· 2.0 MW Β· agreement signed
- Solar project J954, Johnson CountySolar Β· 1.4 MW Β· agreement signed
- Solar project J3107, Johnson CountySolar Β· 150 MW Β· in study
- Gas project G219, Johnson CountyGas Β· 650 MW Β· withdrawn
- Onshore wind project J153, Johnson CountyOnshore wind Β· 30.0 MW Β· withdrawn
- Onshore wind project G976, Johnson CountyOnshore wind Β· 18.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem