United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

SOLAR Β· MISO

Solar project J2108, Johnson County

Solar project J2108, Johnson County is a 150 MW solar request withdrawn in the MISO interconnection queue, in Johnson County, Iowa, connecting to MIDAMERICAN ENERGY CO..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2108
Grid region
MISO (Midcontinent)
Utility / transmission owner
MIDAMERICAN ENERGY CO.
Connection point (POI)
IC ENRON - SUB JIC 161 kV
Location
Johnson County, Iowa
Technology
Solar: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 3; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
9 August 2021
Proposed online date
November 2024
Withdrawn
October 2023

Location

Marker shows the centre of Johnson County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Johnson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem