πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Mississippi

SOLAR Β· MISO

Solar project J1163, Quitman County

Solar project J1163, Quitman County is a 120 MW solar request withdrawn in the MISO interconnection queue, in Quitman County, Mississippi, connecting to ENTERGY MISSISSIPPI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1163
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI
Connection point (POI)
Crenshaw - Tunica 115kv Line Tap
Location
Quitman County, Mississippi
Technology
Solar: 120 MW
Total requested
120 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
12 March 2018
Proposed online date
June 2020
Withdrawn
August 2019

Location

Marker shows the centre of Quitman County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Quitman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem