SOLAR + STORAGE Β· WESTSolar + storage project 1094, Rich County
Solar + storage project 1094, Rich County is a 80.0 MW solar + storage request withdrawn in the West interconnection queue, in Rich County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1094
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Birch Creek-Railroad transmission line
- Location
- Rich County, Utah
- Technology
- Solar: 80.0 MW Β· Battery
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Request moved to transition cluster
- Queue status
- Withdrawn
- Entered queue
- 13 December 2018
- Proposed online date
- December 2023
Location
Marker shows the centre of Rich County; the queue data does not give exact sites.
Other requests in Rich County
- Onshore wind project 300, Rich CountyOnshore wind Β· 362 MW Β· withdrawn
- Onshore wind project 80, Rich CountyOnshore wind Β· 240 MW Β· withdrawn
- Onshore wind project 868, Rich CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Solar + storage project TCS-17, Rich CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project 1083, Rich CountySolar + storage Β· 80.0 MW Β· withdrawn
- Solar + storage project TCS-22, Rich CountySolar + storage Β· 80.0 MW Β· withdrawn
- Onshore wind project 1046, Rich CountyOnshore wind Β· 31.1 MW Β· withdrawn
- Solar + storage project C4-006, Rich CountySolar + storage Β· 20.0 MW Β· withdrawn
- Solar + storage project C4-007, Rich CountySolar + storage Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem