Solar + storage project 1094, Rich County

Solar + storage project 1094, Rich County is a 80.0 MW solar + storage request withdrawn in the West interconnection queue, in Rich County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1094
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Birch Creek-Railroad transmission line
Location
Rich County, Utah
Technology
Solar: 80.0 MW Β· Battery
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Request moved to transition cluster
Queue status
Withdrawn
Entered queue
13 December 2018
Proposed online date
December 2023

Location

Marker shows the centre of Rich County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Rich County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem