ONSHORE WIND Β· ERCOT

Caprock Wind

Caprock Wind is a 300 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
10INR0009
Grid region
ERCOT (Texas)
Developer
Eurus
Connection point (POI)
79501 Ogallala 345kV
Technology
Wind: 300 MW
Total requested
300 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
28 November 2006
Agreement signed
31 October 2014
Proposed online date
December 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem