ONSHORE WIND Β· ERCOT

Cap Rock Power

Cap Rock Power is a 150 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
12INR0033
Grid region
ERCOT (Texas)
Developer
Cap Rock Power, LLC
Technology
Wind: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
24 June 2009
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem