Solar + storage project AF1-251, Clark County

Solar + storage project AF1-251, Clark County is a 220 MW solar + storage request withdrawn in the PJM interconnection queue, in Clark County, Kentucky, connecting to EKPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF1-251
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
EKPC
Connection point (POI)
Avon-North Clark 345 kV
Location
Clark County, Kentucky
Technology
Solar: 220 MW Β· Battery
Total requested
220 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
30 September 2019
Proposed online date
May 2023
Withdrawn
September 2023

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem