United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR + STORAGE Β· PJMSolar + storage project AF1-251, Clark County
Solar + storage project AF1-251, Clark County is a 220 MW solar + storage request withdrawn in the PJM interconnection queue, in Clark County, Kentucky, connecting to EKPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF1-251
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- EKPC
- Connection point (POI)
- Avon-North Clark 345 kV
- Location
- Clark County, Kentucky
- Technology
- Solar: 220 MW Β· Battery
- Total requested
- 220 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 September 2019
- Proposed online date
- May 2023
- Withdrawn
- September 2023
Location
Marker shows the centre of Clark County; the queue data does not give exact sites.
Other requests in Clark County
- Solar project LGE-GIS-2016-001, Clark CountySolar Β· 9.0 MW Β· agreement signed
- Gas project AB2-054, Clark CountyGas Β· 614 MW Β· withdrawn
- Solar + storage project AF1-070, Clark CountySolar + storage Β· 350 MW Β· withdrawn
- Solar project AE2-138, Clark CountySolar Β· 260 MW Β· withdrawn
- Gas project Y1-039A_EKPC1, Clark CountyGas Β· 170 MW Β· withdrawn
- Solar project AE2-210, Clark CountySolar Β· 90.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem