United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· WEST

Other project 2013-G4

Other project 2013-G4 is a 750 MW other request withdrawn in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2013-G4
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Shiprock 345-kV Sub
Technology
Solar: 750 MW Β· Gas
Total requested
750 MW
Study phase
Removed from Queue
Queue status
Withdrawn
Entered queue
30 July 2013
Proposed online date
June 2022

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem